HOME  »  Project Nyac 2006  (80 Slides)     [Page 3 of 6] :: Jump To  
  First page Previous page      HOME      Next page Last page  
DSCN2862 * Another self-portrait changing fuel barrels on the water lift pumps for the dril rig.
IMG_3072 * Keith, Larry, and Scotty wrestle the drill frame into position under the blades of Tom's UH-1.
IMG_3087 * After getting the frame in position, we get a breather while Tom goes for another load.
DSCN2869 * The fully-assembled drill rig onsite.
DSCN2871 * A thousand feet of drill steel waits for Larry to begin operations.
  DSCN2862  
  IMG_3072  
  IMG_3087  
  DSCN2869  
  DSCN2871  
DSCN2876 * First Aid training was a fun diversion from our normal duties.
DSCN2881 * Tom arrives over a drill site with the light plant.
DSCN2883 * Tom was certainly getting a workout flying his UH-1 around with so many loads.
DSCN2884 * The exploration sites were always picturesque.
DSCN2885 * We all learned a ton of various slinging techniques that year, but the cargo net is always the easiest.....
  DSCN2876  
  DSCN2881  
  DSCN2883  
  DSCN2884  
  DSCN2885  
DSCN2893 * Keith checking soil samples in the core shed.
DSCN2894 * Zach logs and records core.
DSCN2898 * Daylight lingers as we approach midsummer.
DSCN2904 * OK, so I wore shorts a couple times....just for style points.
DSCN2910 * The daily drill core delivery.
  DSCN2893  
  DSCN2894  
  DSCN2898  
  DSCN2904  
  DSCN2910  
Album last updated on 7/10/07 8:34 PM
Powered by JAlbum 7.2 and BluPlusPlus skin